Page 2 of 11

Re: 2015's first new project Typhoon IB

Posted: Thu Jan 08, 2015 7:55 pm
by Stikpusher
Between bad weather and holiday celebrations, I missed out on a couple weeks worth of my longest distance bike rides... so today I paid the piper :whiteflag: ... but I am feeling better now :boxing:

So in the mid afternoon I began work on my Tiffy. Of course this is not gonna be straight OOB, so I began with modifications...

As you can see, this kit is old... 1969, the same year as the first Apollo Moon Landing... but the surface detail is not bad at all. Nice petite raised panel lines and some rivets here and there...

Image

since RCAF 439 Sqdn was a "Bombphoon" unit, I had to first fill the rocket rail mounting holes...
Image

Image

I used some strip styrene filed ti fit and a good amount of Plastruct liquid cement for each one, then nipped off the excess... I will sand them smooth later...

Image

Image

then I had to sand away the kit's exhaust stacks to make way for the Ultracast exhaust stacks
Image

Image

The kit's pilot seat is kinda weak - it's made for a seated pilot figure
Image

so I found a possible resin replacement in my spares' drawer
Image

then a test fit of the Ultracast dust filter...
Image

since it is designed for this kit, it drops right in place with no fuss.... nice!
Image

that's all for now...

Re: 2015's first new project Typhoon IB

Posted: Fri Jan 09, 2015 8:03 am
by LyleW
...and we're off! Great start.

Re: 2015's first new project Typhoon IB

Posted: Fri Jan 09, 2015 4:36 pm
by Stikpusher
Last night after dinner I sanded the rocket rail mounting holes smooth and this morning I rescribed the lost panel line detail

Image

Image

after that, I test fitted the upper wings to the lower and noticed a bit of a gap there where the landing light openings are located... so I set about creating some wing spar there to fill the opening

Image

Image

This morning I glued the upper wing halves on the lower wing

Image

Image

and as you can see, the spar is visible...

Image

kinda plain now, but not to worry... I am gonna mount one of these in each opening for landing lights... now I am glad I found them.. I can do a whole bunch of fighters with this package...

Image

and finally I got some work done in the cockpit...

seat separated from the armor plate and resin replacement seat from it's pout stub

Image

and the IP and floor troughs ready for some generic RAF PE detail stuff from Reheat that I have had for ages...

[image]tp://i1319.photobucket.com/albums/t671/stikpusherII/rcaf%20tiffy/100_1304_zpsc19808d9.jpg[/image]

I should have some more progress to show in a few hours...

Re: 2015's first new project Typhoon IB

Posted: Fri Jan 09, 2015 5:59 pm
by CallSignOWL
whoo, nice work

Re: 2015's first new project Typhoon IB

Posted: Fri Jan 09, 2015 7:34 pm
by Stikpusher
Thanks for looking Owl. I am glad that you liking this build. Didn't you do one of these not too long ago?

Well here is the afternoon/evening update...
I used this Reheat generic RAF/FAA set to spiff up the cockpit a bit
Image

added a compass to the IP
Image

and some rudder pedals to the floor troughs. I also added a brass wire connecting rod for the pedals based upon some photos I came across, as well as some styrene rod structure work to add what I saw in those photos... those pedals were a challenge as first you had to bend them to shape, then add the upper crossbar...
Image

Image

I also added another layer of armor (sheet styrene) to the cockpit rear bulkhead, the seat, some framework, as well as a retaining bar for the harness. I have some Eduard RAF late war Harnesses that I will use on this after painting
Image


it may not look like much but those little PE things drove me a bit crazy... but nowhere near as bad as my last PE experience...

Re: 2015's first new project Typhoon IB

Posted: Fri Jan 09, 2015 8:34 pm
by Paul
aren't you done yet?
Image

Re: 2015's first new project Typhoon IB

Posted: Sat Jan 10, 2015 7:39 am
by BsYamato
Seems you goung to remove some year to this old mouuld :)

Re: 2015's first new project Typhoon IB

Posted: Sat Jan 10, 2015 7:42 am
by LyleW
Nice work Stik! You are becoming quite good at this scratch em up type of building. Fun to watch.

Re: 2015's first new project Typhoon IB

Posted: Sat Jan 10, 2015 12:05 pm
by Stikpusher
Paul wrote:aren't you done yet?
Image
:chair: No, not a weekend madness this time... :youwish:
BsYamato wrote:Seems you goung to remove some year to this old mouuld :)
Oh I hope not... that is one of my trademarks...
LyleW wrote:Nice work Stik! You are becoming quite good at this scratch em up type of building. Fun to watch.
Ya know, the more I do of that sort of stuff, the more I enjoy it... I love a new tooled well detailed kit with all those things already there, but I have more fun dressing up these old kits. New kits are for me to recharge my batteries after a particularly challenging build project...

But I gotta try to keep up with BSY and Fermis here... :tease: